Address
304 North Cardinal
St. Dorchester Center, MA 02124
Work Hours
Monday to Friday: 7AM - 7PM
Weekend: 10AM - 5PM
Address
304 North Cardinal
St. Dorchester Center, MA 02124
Work Hours
Monday to Friday: 7AM - 7PM
Weekend: 10AM - 5PM
Function: Electric Grill Marking Machine
Capacity:100kg/hour, 200kg/hour, 400kg/hour,600kg/hour,
Model: AVN200, AVN300, AVN400, AVN600
Category: Grill Bar Marker Machine
Brand: AVAN MACHINERY
Price: USD3000 to USD25000 PER SET.
Supply Ability: 5 SETS PER MONTHLY
The meat steak bar marking machine is specially crafted to imprint various grill patterns—such as straight or checkered lines—on a wide range of food items, including meats, poultry, fish, and vegetables. It enables simultaneous grilling on one or both sides and can be adjusted to handle varying product thicknesses. The machine is designed with hygiene in mind, featuring a removable conveyor for simple cleaning and upkeep. It also offers an optional belt brush with a continuous washing system to minimize water usage.
Machine Specification
Producer: Avan Machinery
Material: Fully stainless steel
Belt Width: 600 mm
Heating: Electrically heated
Belts: Mesh wire belts for both infeed and outfeed
Rolls: Two rolls – top and bottom marking
Temperature Control: Independent temperature adjustment for each roll
Gap Height: Adjustable between the rolls
Power: 27.5 kW
Electrical Supply: 3 x 400 V – 50 Hz
Speed: Adjustable
Mobility: Mobile
Dimensions (L x W x H): Approx. 1600 x 1600 x 1600 mm
Weight: 700 kg
Customer & Service
We shipped the machinery to numerous countries globally, including Italy, Germany, Russia, Turkey, Australia, Indonesia, India, etc. Our machines and service have received commendations from nearly every customer, fostering repeat business.
1.Twelve months following installation (Within 13 months of delivery).
2.Complimentary advisory service prior to, during, and post-sales.
3.Supply fundamental production methods and formulations.
4.International on-site setup and personalized training for machine maintenance and operation.
5.Calibration and examination of the machinery until all components are operational before departing the manufacturing facility.
Packaging & Shipping
1.Daub coal oil on the surface of the machines.
2.Plastic film as the inner packing.
3.Train, ship of depend on clients’ requirement.
FAQ
Q: What is the duration of machine warranty period?
A: Our guarantee spans one year from the commencement of operations.
Q: Are the machines made by stainless steel.
A: Yes, 304 food grade stainless steel.
Q: Can you describe the installation process?
A: We will deploy our skilled technicians to your facility to oversee the installation and commissioning tasks, providing training for your operators.
Q: If we share our factory layout, can you assist in designing the entire production line?
A: Certainly, our seasoned engineers and technical staff can aid in organizing the layout and overseeing the installation of the entire production line, tailored to your specific circumstances.
Q: What is the timeframe for your delivery?
A: Typically, it takes 7 – 10 days for stocked items, and 30 – 45 days for non-stock items, depending on the quantity.
Q: Will you provide support if issues arise during future production?
A: Absolutely, we are committed to being at your service. You can reach me through mobile, WhatsApp, Skype, Viber, WeChat, and more. I will promptly address and resolve any problems you encounter.